NIST SP 800-53 Rev. 5
SA-15(3)
System and Services Acquisition
enhancement

Criticality Analysis

Parent: SA-15

Description

Require the developer of the system, system component, or system service to perform a criticality analysis: a. At the following decision points in the system development life cycle: [organization-defined parameter] ; and b. At the following level of rigor: [organization-defined parameter].

Mapped SPARTA techniques

80 techniques

Cite as SafeMode Space, nist-80053-rev5 SA-15(3).

Built 2026-07-25 from 216 techniques, 334 regulation articles, 125 ENISA controls, 2,610 framework controls, and 90 countermeasures.