Art. 84(4)
Mapped SPARTA techniques (3)
Techniques referencing this article
84(4)'s preventive and protective measures regarding the ground segment (Annex VII point 5.4) cover the operator's design discipline against ground-SDA pipeline corruption.
84(4)'s preventive and protective measures regarding the ground segment (Annex VII point 5.4) are the design discipline that limits ground-system intrusion success rate.
84(4)'s preventive and protective measures regarding the ground segment (Annex VII point 5.4) are the design discipline that limits initial-access success rate via the ground.