eu-space-act

Art. 93(6)

Full text: this article's wording is third-party regulatory text. See the official source for the authoritative provision.

Mapped SPARTA techniques (5)

Techniques referencing this article

  • IMP-0002DisruptionST0009
    triggers obligation
    moderate
    direct

    Disruption that causes severe operational disruption of space activities or considerable financial loss meets the 93(6) significant-incident threshold and triggers the 93(1)/(2) reporting obligations.

  • IMP-0003DenialST0009
    triggers obligation
    moderate
    direct

    Denial that eliminates space-mission services meets the 93(6) significant-incident threshold and triggers manufacturer notification obligations.

  • IMP-0004DegradationST0009
    triggers obligation
    moderate
    direct

    Permanent degradation causes severe operational disruption — meeting the 93(6) significant-incident threshold and triggering 93(1)/(2) reporting.

  • IMP-0005DestructionST0009
    triggers obligation
    high
    direct

    Destruction of mission assets is a clear severe operational disruption under 93(6)(a), triggering 93(1)/(2) reporting via the structure referred to in Art. 34(4) of Regulation (EU) 2021/696 and to competent authorities.

  • IMP-0006TheftST0009
    triggers obligation
    moderate
    direct

    Theft of mission-critical data can cause considerable damage to natural or legal persons (93(6)(b)) and may also disrupt the affected service — triggering 93(1)/(2) reporting.

Built 2026-07-25 from 216 techniques, 334 regulation articles, 125 ENISA controls, 2,610 framework controls, and 90 countermeasures.