eu-space-act

Art. 93(7)

Full text: this article's wording is third-party regulatory text. See the official source for the authoritative provision.

Mapped SPARTA techniques (5)

Techniques referencing this article

  • IMP-0002DisruptionST0009
    addresses
    high
    direct

    Disruption significant-incident reporting (primary: Art. 93(6)) cascades to 93(7)'s 12h/24h/72h timing schedule — early warning, intermediate update, and follow-up reports.

  • IMP-0003DenialST0009
    addresses
    high
    direct

    Denial significant-incident reporting (primary: Art. 93(6)) cascades to 93(7)'s timing schedule.

  • IMP-0004DegradationST0009
    addresses
    high
    direct

    Degradation reporting (primary: Art. 93(6)) cascades to 93(7) — 12h/24h/72h schedule applies even when degradation is gradual.

  • IMP-0005DestructionST0009
    addresses
    high
    direct

    Destruction reporting (primary: Art. 93(6)) cascades to 93(7) — early-warning within 12h is required for Union-owned destroyed assets.

  • IMP-0006TheftST0009
    addresses
    moderate
    direct

    Theft reporting (primary: Art. 93(6)) cascades to 93(7) — confidentiality-impacting incidents follow the 12h/24h/72h timing schedule.

Built 2026-07-25 from 216 techniques, 334 regulation articles, 125 ENISA controls, 2,610 framework controls, and 90 countermeasures.