nis2-impl

Annex 13.3.1

Full text: this article's wording is third-party regulatory text. See the official source for the authoritative provision.

Mapped SPARTA techniques (3)

Techniques referencing this article

  • IA-0007Compromise Ground SystemST0003
    addresses
    moderate
    derived

    Perimeter and physical-access control over MOC and ground-station facilities is the implementing-regulation obligation that prevents on-site insertion paths for ground-segment compromise.

  • ATLO concentrates personnel, tools and authority at a physical site; perimeter and physical-access control are the implementing-regulation obligations that prevent on-site insertion paths during AIT and pre-launch.

  • LM-0006Launch Vehicle InterfaceST0007
    addresses
    moderate
    derived

    Perimeter and physical-access control over launch-pad EGSE rooms and integration facilities prevents on-site compromise paths through the umbilical and separation-avionics interfaces.

Built 2026-07-25 from 216 techniques, 334 regulation articles, 125 ENISA controls, 2,610 framework controls, and 90 countermeasures.