All ENISA publications
ENISA-STL-2025-03-sD.31-i06

Publication: enisa-stl-2025-03 Space Threat Landscape

Full text

The control text is third-party content; see the official source for the full wording.

Mapped SPARTA techniques

7 techniques

  • DE-0002Disrupt or Deceive DownlinkST0006
    addresses
    moderate

    System redundancy across ground stations and processing chains preserves operator visibility when one downlink path is disrupted.

  • DE-0002.02Jam Link SignalST0006
    addresses
    moderate

    Geographically distributed redundant ground stations preserve a path for telemetry reception when one site is jammed.

  • EX-0013FloodingST0004
    addresses
    moderate

    Ground-segment redundancy with fully backed up servers and load balancers enables shifting throughput when one site is flooded.

  • System-redundancy planning is the operational context in which backup channels exist; their security posture should match the primary, addressing the gap IA-0004 exploits.

  • IMP-0002DisruptionST0009
    mitigates
    high

    System redundancy across ground-segment infrastructure preserves continuity when one path is disrupted, the canonical operator-side defense against IMP-0002.

  • IMP-0003DenialST0009
    mitigates
    high

    Geographically distributed redundant facilities provide alternate command and telemetry paths when one site is denied.

  • IMP-0005DestructionST0009
    mitigates
    moderate

    System redundancy across ground-segment facilities and key/code material preserves mission viability when individual subsystems are destroyed.

Built 2026-07-25 from 216 techniques, 334 regulation articles, 125 ENISA controls, 2,610 framework controls, and 90 countermeasures.