eu-space-act

Art. 87(3)

Full text: this article's wording is third-party regulatory text. See the official source for the authoritative provision.

Mapped SPARTA techniques (8)

Techniques referencing this article

  • DE-0002.02Jam Link SignalST0006
    addresses
    high
    direct

    Downlink jamming is a specific case of 87(3)(f) interferences-on-the-ground-segment — the response-and-recovery plans must contemplate jamming scenarios.

  • Art. 87(3)(f)'s ground-segment-interference scenario is domain-relevant to AGC-tampering self-denial, but lists a crisis scenario rather than interdicting the tampering.

  • EX-0016JammingST0004
    addresses
    high
    direct

    87(3)(f) explicitly covers interferences on the ground segment as a crisis-management scenario the operator's response-and-recovery plans must address — jamming is the canonical case.

  • EX-0016.01Uplink JammingST0004
    addresses
    high
    direct

    Uplink jamming is a specific case of 87(3)(f) interferences requiring response-and-recovery planning — including alternate uplink procedures and contingency commanding paths.

  • EX-0016.02Downlink JammingST0004
    addresses
    high
    direct

    Downlink jamming affects ground-receive capability — within 87(3)(f) interferences-on-the-ground-segment scope; alternate geographically distributed sites mitigate via geographical splitting under 86(3)(b).

  • Art. 87(3)(f)'s ground-segment-interference crisis-planning scenario is domain-adjacent to PNT jamming, but does not interdict GNSS denial or cleanly cover space-segment PNT; alternate-PNT design is the resilience mitigation.

  • IA-0008.03ASAT/Counterspace WeaponST0003
    addresses
    moderate
    inferred

    Art. 87(3)(f)'s ground-segment-interference scenario is domain-relevant to counterspace effects, but lists a crisis scenario rather than providing a concrete interdiction or resilience mechanism.

  • IMP-0003DenialST0009
    addresses
    high
    direct

    87(3)(f) explicitly covers interferences on the ground segment as a crisis-management scenario — denial is the primary case.

Built 2026-07-25 from 216 techniques, 334 regulation articles, 125 ENISA controls, 2,610 framework controls, and 90 countermeasures.