NIST SP 800-53 Rev. 5
SI-13(4)
System and Information Integrity
enhancement

Standby Component Installation and Notification

Parent: SI-13

Description

If system component failures are detected: a. Ensure that the standby components are successfully and transparently installed within [organization-defined parameter] ; and b. [organization-defined parameter].

Mapped SPARTA techniques

59 techniques

Cite as SafeMode Space, nist-80053-rev5 SI-13(4).

Built 2026-07-25 from 216 techniques, 334 regulation articles, 125 ENISA controls, 2,610 framework controls, and 90 countermeasures.